
Digital Project Management
Powered by the Entegre Digital Reporting System, BUILDEST and EVERYPROJECT, we run data-driven project management with visualised, always-current project data.
In order to increase the service quality, Entegre promotes and integrates technological solutions to its processes. Entegre developed its own Digital Dashboard, which enables instant information sharing about project progress and accelerates the decision making process. For more effective communication on site, Entegre uses new solutions such as BUILDEST document management system during the communication with the project shareholders and EVERYPROJECT as a quality control system.
ENTEGRE DIGITAL DASHBOARD
Entegre Digital Dashboard provides visual analytics across all project data such as progress status, financial status, change orders, project schedules, quality issues and NCRs, shopdrawing requests, RFIs and material approvals. Entegre Digital Dashboard is always dynamic and up to date with instantaneous data collection and input from the cloud. Entegre Digital Dashboard exposes key performance indicators (KPIs) enabling Clients and Stakeholders to quickly understand the general project status and possible risks. Integrated algorithms powered by business intelligence tools provide an early warning that foresees problematic issues allowing relevant staff to correct them before these issues cause delays and cost overruns.
BUILDEST
BUILDEST is a document sharing and management software developed by YAPITAŞI information technologies to raise and improve ENTEGRE's project management service standard. In projects carried out by ENTEGRE, investors, project management, designers, contractors, and sub-contractors are systematically able to share project related files through BUILDEST.
BUILDEST developed entirely web-based. Through BUILDEST, parties of project by entering their unique passwords, can reach project related documents at any time and from anywhere, and quickly share them with other responsible parties. Far beyond the classic methods, fast, secure, seamless file sharing and storage is provided with BUILDEST. Each upload, upload date, and time are recorded in the system.Relevant persons can be notified of newly added files to BUILDEST by e-mail, instant messaging, and if desired via text message.
Thanks to these features, arguments ignited by frequently encountered problems such as file/project is not received are not seen in BUILDEST managed projects.
EVERYPROJECT
Yapıtaşı EveryProject is a new age quality control software. It can be used by all the Project stakeholders easily and its features are listed below:
- Creating a control check list and tracing the works according to the list
- Locating the error through the project plan and taking a photo
- Assigning work and responsibilities for the defficiencies and errors
- Tracking the errors and control lists by categorizing
- Periodical reporting of the control list and quality
Services
Want to Learn More About Our Services?
Let's determine the right service solutions for your needs together.
